CEC Facilities Group in partnership with Blattner Energy installed distribution equipment for the wind turbine project in Oklahoma which spans 23 square miles. CEC installed over 219 miles of medium-voltage distribution cable. The scope of work includes underground placement of all cable, terminations and substation tie-ins.
Aragorn Solar
CEC helped build two solar projects in West Texas. These projects consist of 400-plus MW solar systems, which were all deployed in 9 months. CEC installed all medium-voltage and low-voltage scopes between solar panels, DC collection systems, medium-voltage collection systems and substation tie-ins.